This page will be blocked on 1st June. To avoid this, please upgrade to PRO or VIP plan for only 1.50 USD a month in your hosting panel.
This page is hosted for free by aba.ae, if you are owner of this page, you can remove this message and gain access to many additional features by upgrading your hosting to PRO or VIP for just 1.50 USD.
Do you want to support owner of this site? Click here and donate to his account some amount, he will be able to use it to pay for any of our services, including removing this ad.

Project Title

Shtoura Villa

Short Description

Three Sources 3x100A Power Panel with Load Management System

Description

The old system in the villa was initially installed in the year 1989. In the previous period, the system started encountering serious problems with sudden power cut offs. No electrical schematics were available and there were a need for a load management system.
A controller-based 3 sources power panel with distribution breakers was designed, implemented and installed, achieving a stable and repairable power supply to the building.

Brand: "Mitsubishi" and "Schneider"
Rating: 3x150A
Location: Chtoura, Bekaa, Lebanon
Year: 2016